Pediatric patients leading in an opening prayer.
Nutritional assessment on a mulnourished child.
Patients waiting to receive drugs.
Staff arranging patients files.
Staff nurses dispensing drugs.
Doctor examining a neck swelling.
Lab technician doing a urine analysis.
Patient waiting for lab results.
Patients waiting for the doctor to be examined.
Patients at the reception while nurse is taking their bio Data.
Staff nurse taking patients vitals (temperature)
Staff nurse reading patient's blood pressure.
Staff nurse addressing patients and counseling them.
Nurse explaining to patients on how to take the prescribed medication.
Staff nurse educating patient how to use the drugs give and advising the patient to take the medicine as prescribed.
Inside the laboratory.
Inside the pharmacy showing a displayed sample of drugs.
Inside the pharmacy showing intravenous drugs.
Patient after receiving drugs.
Neonatal incubators in the neonatal intensive care unit.
Inside the general medical ward.
Admitted patient receiving treatment inside the ward.
Patients waiting to receive drugs from outside.
Patients waiting for lab results.
Patients listening to instructions from staff .
Patients in a health talk about the common illnesses by the the doctor.
Staff explaining to a patient on how to use and when to take the drugs given.
Staff nurse taking blood pressure of patients.
Patients waiting to see the doctor.
Patient waiting for drugs.
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP.
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP
MVHCP
Began with a humble beginning 4 years ago
Health Center as per 27th November 2012
Concrete works on the front verandor at the end of February 2013
Commencement of drilling the Borehole
Borehole secured and Pedistal installed
Manhole construced around the Borehole
Construction of Tank stand in progress
Tank installed and Solar Panels fitted
Control panel, Back up batteries installed and secured.
Public water collection point completed and operational
Water Analysis and certificate from the Ministry.
Construction of Public toilets with washing basins and showers.
Plumbing works from the public toilets to the septic tank
Painting works begin on the public toilets
Excavation of the septic tank
Brick work in the septic tank
Steel and Concrete works on top of the septic tank
Septic tank completed
External works on main Building begins.Thanks to Christy and Joel of Providence Land scaping
External works continue
Internal sealing frame begins
Window and door glasses-Out patiend=d department begin.Thumbs up for Christy and Joel
Water meter installed from assesment of water consumed by Muira village
Muira Village Health Center water committee
The structure that housed the first clinic (February 2008)
Namugogo’s leg with a protruding bone being cleaned before being operated upon(L), and the leg after operation (R).
Rita Hawkins (R) a supporter from Indianapolis with some of the children in Muira village (December 2008)
Clearing the ground
Ground ready for work
Foundation digging
Fetching water
Mixing the motor
Laying the blocks to dry
Making the blocks locally